Kitchen renovation background

Kitchen renovation — Melbourne specialists

Complete kitchen makeovers, cabinetry upgrades, flooring and lighting — tailored, reliable, and compliant with Australian standards.

Project manager
Liam — Project Lead
Licensed contractor & kitchen specialist
Finished kitchen

Design & planning

Spatial planning, material selection, and realistic budgeting for your kitchen project.

  • Concept sketches
  • 3D visuals
  • Compliance checks (AUS)

Cabinetry & joinery

Custom joinery, modular cabinets, and durable finishes installed by experienced trades.

Flooring & tiling

Waterproof floor solutions, tile layouts, and underlay prep for long-lasting performance.

Plumbing & electrical

Licensed plumbers and electricians for safe installations and appliance connections.

Surface finishes

Benchtops, splashbacks and paint finishes tailored to modern and classic tastes.

Project management

Single point of contact, scheduling, and quality control through to final handover.

Our process

A clear three-phase approach keeps timelines firm and delivers expected outcomes.

  1. Consult & measure: On-site assessment, brief and budget discussion.
  2. Design & quote: Presentation of options and fixed quote.
  3. Deliver & finish: Scheduled works, trades coordination and final inspection.
Renovation in progress

Selected projects

Speak with a consultant
Project 1
Compact apartment kitchen — Fitzroy
Space optimisation and integrated appliances.
Project 2
Family home kitchen — Carlton
Open plan reconfiguration and island bench.
Project 3
Heritage overlay update — Northcote
Sympathetic finishes with modern function.

FAQ

Most projects run 4–8 weeks depending on scope. Larger structural changes extend timelines; we provide a schedule at quoting.

We assist with documentation and liaise with consultants; full approvals depend on the project and local council requirements in AUS.

Yes — we provide colour-matching and custom joinery to integrate with preserved elements.

We offer workmanship warranties and coordinate manufacturer warranties for appliances and fixtures; details are on our quote.

Estimated guide — costs & timelines

PackageIndicative cost (AUD)Typical duration
Refresh (surface upgrades)$8,000–$18,0002–3 weeks
Upgrade (new cabinetry & appliances)$18,000–$45,0004–8 weeks
Full remodel (layout change)$45,000+8–14+ weeks
Prices vary by finishes, appliances, structural work and council requirements. For a tailored quote, book an inspection.

Ready to start your kitchen project?

We provide on-site inspections across Melbourne and clear, fixed quotes. Typical checklist included with every visit.

  • Site measure & brief
  • Material sample review
  • Indicative schedule and next steps